Do I need scaffolding, or will a ladder do?
Brief, light, low tasks suit a ladder; a day or more at height suits a tower; sustained work, heavy materials or roofline access suits a scaffold. The Work at Height Regulations 2005 require falls to be prevented where reasonably practicable, which in practice pushes most trade work onto platforms.
The rule behind the answer
The Work at Height Regulations 2005 do not ban ladders; they require work at height to be planned, and falls prevented where reasonably practicable. In practice the judgement runs on three axes: how long the work takes, how heavy or awkward the materials are, and how high and exposed the position is. A contractor balancing on a ladder for hours with one hand on a drill fails all three. The regulations bind anyone having construction work done, and a homeowner who hires a trade has a legitimate interest in how that trade works on their roof.
Ladder, tower or scaffold: the honest split
- Ladder: minutes-long, light, low tasks. Reading a meter at height, clearing a gutter blockage within easy reach, inspecting something. Nothing sustained, nothing heavy, nothing at roof level for long.
- Scaffold tower (from £250): a day to a few days of hands-on work at one position: painting a gable, replacing a fascia run, fitting a camera or light. A guarded platform with both hands free.
- Edge protection (from £300): short trade work at the eaves: guttering, felt and tile repairs, solar installation. The compliant guardrail without the full structure.
- Full scaffold (from £600): anything sustained, anything along an elevation, anything with materials going up: rendering, repointing, roofline replacement, chimney work, re-roofs.
The jobs that always want a scaffold
Chimney repointing, flashing and removal: hours at stack height with tools and materials, see chimney scaffolding. Rendering and repointing an elevation: days of platform work along the wall. Roofline replacement: fascias, soffits and gutters along the full run. Re-roofs: strips of heavy material coming off and going on for days, usually with a temporary roof if the weather is a risk. And anything where two or more people work at height at once.
Asking the question of your trade
If you have booked a roofer, renderer or decorator, one question tells you most of what you need: how are you accessing the work? A proper answer names a tower, edge protection or a scaffold, sometimes already priced into their quote. A shrug, a ladder and confidence is your cue to get the access priced properly: the cost guide has the figures, and the quote form takes two minutes.